Hi guys,
I have a business scenario. We receive a production material from a different location into plant via trucks and immediately move the stock into a storage location A in the plant. Once the stock is moved to this storage location, we need to create a Inspection lot (Material/batch specific) and have an inspection for 72 hours. Further when this stocks moves from storage location A to storage location B the stock in the inspection lot needs to be decremented and move from Quality to unrestricted. Further we want to close the inspection lot by doing a Auto UD when the inspection lot Qty becomes '0".